POWER SYSTEM TRANSFORMATION OF MV XUE LONG OF POLAR RESEARCH INSTITUTE OF CHINA,INTEGRATED POWER SYSTEM TECHNOLOGY FOR THE NEW POLAR EXPEDITION SHIP
In 2012-2013, SMEDRI carries on the China's only polar scientific research vessel - "XUE LONG" restorative transform integrated power system, through a new low speed diesel engine, medium speed diesel generator set, monitoring system and distribution system, increase the energy management system. Successful “heart surgery” were carried out for the vessel and has come to a successful conclusion. In 2014, as the power system integration responsibility unit, SMEDRI began to participate in the new ton polar expedition ship construction.
POWER SYSTEM INTEGRATION FOU YUEHAI TRAIN FERRY
SMDERI signed the contract with Yuehai Railway Co., Ltd in August 2009, and has completed delivering of two ships respectively at the end of 2010 and in the first half year of 2011. The power system design and integration supply scope includes main propulsion system, power plant system, combined monitoring system and whole ship vibration and noise reduction system. SMDERI developed PTO/PTI diesel-electric hybrid power system for the first time in China and put it into use successfully.